Boarded Flooring

(Secret Nailing System)

5″ in width,3/4″ in thickness & 2′ – 8′ in random lengths, Fixed using fishbone type nails/ pins concealed through the tongue on to a 1″ x 3/4″ Tapered wooden batten frame work, which is screwed in to a leveled cement Surface, in 16″ intervals.

(A leveled cement rendered surface before we fix the battens & Filling the space/gap using cement Screed after we fix the battens to be done by the client)

techinical-section-image-two

techinical-section-image-one

Boarded Flooring

(Secret Nailing System)

5″ in width,3/4″ in thickness & 2′ – 8′ in random lengths, fixed on to a smooth cement rendered surface (to be provided by the client) Using Adhesive & by surface nailing using brass screws and roll plugs and the nail head to be covered with a wooden cap.

techinical-section-image-three



Boarded Flooring

(Secret Nailing System)

75mm in width,12mm in thickness & 300mm in lengths – fixed on to a smooth cement rendered surface (to be provided by the client)using adhesive only.

techinical-section-image-four

Sports Floors

(Gymnasiums, badminton courts, basketball courts, Volleyball
courts, squash courts, multipurpose sports facilities, dancing
flooring, etc.) Asian Oak (Treated Rubber Wood – Copper,
Chromium, Bores Chemical Pressure Impregnated) Cushion
Battened Sports Flooring:

81mm wide 18mm thick, & 600mm – 1800mm long in random lengths treated rubber wood strip flooring fixed by secret nailing using fishbone type pneumatic nails/ pins (Galvanized steel) on to 75mm x 50mm (72mm x 47mm finished size)Battens laid in 300mm intervals. All surfaces covered with vapor barrier under the 15mm thick air cushion pad laid in 300mm intervals. On completion of installation the floor should be left for two (2) weeks minimum for natural drying and then Sanding with 36, 60, 100 grit sand paper and applying 3 coats of hardwearing Water based coats.

techinical-section-image-five

Air cell cushioning rubber Pads system is a free floating resilient sports flooring structure Recognized by sports organizations internationally, used for many indoor sports activities. Their unique construction features a system of air cell cushioning pads, made of specially formulated natural rubber. When rubber pads are compressed, the air encapsulated within the uniquely formed cells is expelled through ventilation voids at the perimeter. The controlled expulsion of air provides the critical shock absorbing effect that reduces sports injuries. It is significant to note that construction of air cell cushioning pads sports flooring system results in consistent resilience throughout the court, in uniform ball bounce.

techinical-section-image-five

Staircases

(Surface Nailing)

fixed on to a smooth cement rendered surface (to be provided by the client) by surface nailing using brass screws and roll plugs and the nail head to be covered with a wooden cap.

techinical-section-image-seven

techinical-section-image-eight

Attics/Decks/Mezzanine Floors

(Surface Nailing System)

51/2″ in width, 1″ in thickness & 2’- 6’ in random lengths, Fixed at 1/2″ spacing, by surface nailing using brass screws and the nail head to be covered with a timber dowel, on to the Timber Joists. TIMBER RAFTERS/JOIST: TULANG WOOD -125x75mm(Actual size 112x62mm)

techinical-section-image-nine



Skirting

Fixed by surface nailing using brass screws and roll plugs and the nail head to be covered by a wooden cap.

techinical-section-image-ten

Cutting and polishing of Existing
Wooden Floors

(Including Repairs & Upgrading) : Sanding with 36, 60, 100 grit sand paper and applying 3 coats of water based hardwearing wood floor Courting.

techinical-section-image-twelve

WORK CONDITIONS

Sub-floor requirements: Necessary surface preparations to be coordinated with us & carried out by the client. The sub-floor on which a wood is laid should be leveled, dry, damp-proof, smooth cement floor.

Anti termite soil Treatment: The client to carry out a proper Anti termite soil Treatment or sub slab recharging System, Prior to slab laying (Log on to www.piperguard.com -Tel: 011 2791777 / 0773 647125 or www.finlays.lk – Tel: 011 2449308 / 0773 943959) , for Specialized Service Providers Opinion)

Site requirements Prior to commencement of work: The premises should be completely closed in with outside windows and doors in place and all other openings covered with No Temporary coverings using materials such as Polythene, est. , to prevent the floor from exposures such as rain and sunlight.. (This may cause shrinkages and warping of wood).All Wet functions should be completed, (drywall, paint, ceramic tile, bathroom works, etc.). Air conditioning systems should be operational in accordance with “Normal Living Conditions” 3-5 days before cutting & polishing, for The wood floor to get acclimate to prevailing conditions.

Installation & polishing Expectations: During and after installing of wooden floor no one will be permitted to walk on it for at least 24 hours. On completion of installation (prior to cutting & polishing) the floor should be left for 10 days for natural drying, to allow the wooden floor to settle down completely after drying. Also after polishing, must allow the coatings to dry for at least 2 days even though the coating is tack dry after couple of hours.

Infrastructure requirements: Electricity (With Required power voltages, points, etc. for the machinery & other electric tools), water with sanitary facilities & accommodation (If required) to be provided for the working staff By the client.

REALITY ACCEPTANCE

Natural finish: The floor will be in natural colour in dark & light shades with natural grain & Nods. Grain matching & colour selection is not possible with natural/solid wood. A minor percentage of (approx. 1%) sap, nods & heart may occur on natural/solid timber

Kiln Drying: All timber supplied by us are being kiln dried up to 12%-15% moisture levels. How ever shrinkages of planks may take place (on the odd occasion) up to 1mm-3mm (especially in the areas close to doors & windows), due to the effects of warm sun or its glare. The usage of Air conditioners too may cause this condition as it absorbs moisture. (Drying a solid wood below 10% moisture level in a kiln drier isn’t possible as it’ll crack). The solution for these occasional circumstances would be to fill the gaps using wood filler, once the movement settles. We bear no responsibility on wood materials supplied by the client with regard to its treatments (e.g.: Drying, etc.)

TIME DURATION FOR MANUFACTURING & WORKMANSHIP

Production: Approximately 60 working days for 3000 Sqft (Subject to variation, depending on the type of wood)

Installation: 10 working days for 3000 Sqft (working hours from 9:00 am – 8:00 pm & No other work could be carried out at site)

Polishing: 7 days for 3000 Sqft (working hours from 9:00 am – 8:00 pm & No other work could be carried out at site)

PAYMENT AGREEMENT & ADDITIONAL COST NOTIFICATION

Payment requisites For:
Wood Supplying, Installing & Polishing, 50% on confirmation, 25% on material delivery, 15% on Installation (prior to polishing) &10% on Completion.

Payment requisites For:
Installing & Polishing(Wood Materials Supplied by the client), 50% on confirmation, 40% on Installation (prior to polishing) &10% on Completion.

Payment requisites For:
Cutting & Polishing of existing wooden floors, 75% on confirmation & 25% on Completion.

Transport & Bata:
chargers will be imposed separately for out station sites (depending on the distance & quantity).

Spiral/odd shaped staircases:
cost may increase up to 75% than the Standard Staircase rates, depending on the wastage).

Floor Borders:
Prices shall be the same as staircase rates.

Clients cooperation,
in honoring to ‘A’ Brands’ payment Stipulations, is of paramount important, in order to complete & produce a quality floor & to maintain a trouble free/smooth/friendly Operation.(Not adhering to these payment terms will guide ‘A Brand’ to recover the loses gained, by removing the wood supplied/installed from the clients site, before settling the advances received from him.(If an advance Payment is made by the client, it will be returned only after/if recoveries made to cover the value).

Price Fluctuations:
In the event of an advance payment(s) is/are made to ‘A’ Brand’ & no site operations taken place due to client’s/site delays, for more than six(6) months, (from the last date of advance received) the quoted rates are subject to price fluctuations, unless total contract value is made upfront.

Quotation validity:
The Quotation tendered is valid only for a period of for 30 days (from the date quoted in the estimate pro-forma). All offers unless stated to be firm are without engagement and subject to price fluctuation and stock of Raw Materials Being available.

Maintenance

Solid wood Floors: Impart richness, warmth and natural beauty to the interior… It is a permanent floor extremely durable and long lasting. The key to success of a hardwood floor lies in pre- installation job conditions and a little care, which can enhance the value of one’s home and office over a period of time.

READ MORE

main_tains_img